HDPE Tee Electrofusion Tee Ef Tee

HDPE Tee Electrofusion Tee Ef Tee

HDPE electrofusion reducing tee in SDR11 & SDR17 for water & outdoor gas, Sizing available from dn20~dn630mm, Injection molded by top quality PE80 or PE100 material, Conforming to ISO4427-3/EN12201-3/EN1555/EN ISO 15494 standard, 3 years warranty in quality / 50 years lifetime, Most competitive factory wholesale prices, Large stock available for regular sizes, short delivery available!
Send Inquiry

Description

Technical Parameters

We will uphold our business philosophy of 'professionalism, technology, integrity' and be a high-end manufacturer of uPVC Reducing Coupler, PVC Fittings, uPVC Pipe Cap. We will continue to move customers with sincere service and create value for them forever! With the development of science and technology, strengthening scientific research and realizing technological improvement and invention have become important means for our company to obtain high profits, compete for the market and improve competitiveness. Our company pays attention to the construction of enterprise culture, attaches importance to the concept training, and establishes the enterprise spirit of "unity, responsibility, efficiency and innovation", and has two teams of competent technology development and market development.

HDPE Electrofusion Fittings, HDPE Electrofusion Reducing Tee, Electrofusion reducing Tee,Electrofusion tee reducer


HDPE electrofusion reducing tee is used to tee off a HDPE pipe, to add in a smaller size outlet to a PE pipe. Electrofusion reducing tees are often used to supply water or gas to an area from a main pipeline, as they have a smaller off-take (and therefore less flow) than the original pipeline.


Electrofusion reducing tee fittings may also be known as an electrofusion tee reducer or EF reducing tee. It has implanted metal coils placed around two ends of outlets, and the other branch outlet are spigot type, and requires a coupler to join it to another pipe or fittings.


Made by 100% PE100 material, SUNPLAST HDPE reducing tee electrofusion can can be supplied in a diameter sizing from dn32~dn400mm in SDR11-PN16. SDR 11 electrofusion tee reducer fittings are rated to PN16 for water and PN10 for gas.


The electrofusion reducing tee fittings are injection molded in one time, and conform to ISO4427-3,EN12201-3, AS/NZS 4129, EN1555, EN ISO15494 standard (ISO4437-3 for gas)


SUNPLAST keeps mass stock in demand for regular sizes, and customers’ urgent demand & prompt shipment request can be satisfied.


More brief details as below:

Product

HDPE Electrofusion Reducing Tee, Electrofusion reducing Tee,Electrofusion tee reducer

Specification

DN32~DN400mm

SDR/pressure ratings

SDR11-PN16

Material

Virgin PE100 material

Manufacturing Process

Injection molded

Color

Regular stock in black, blue/yellow available if quantity is big

Manufacturing Standard

ISO4427-3,EN12201-3, AS/NZS 4129, EN1555, EN ISO15494

(ISO4437-3 for gas)


Product Specifications

HDPE Electrofusion Reducing Tee: available from DN32×20~DN400×315mm

Pressure: SDR11-PN16 & SDR17-PN10

Material: 100% virgin PE100 material

Color: black color or blue color.

image001

image003

ΦD×ΦD1

L

A

B

Φd

SDR17

SDR11

32×20

118

45

48

4.0/4.7

×

32×25

118

45

48

4.0/4.7

×

50×25

147

51

54

4.0/4.7

×

50×32

147

51

54

4.0/4.7

×

50×40

147

52

56

4.0/4.7

×

63×25

168

57

49

4.0/4.7

×

63×32

168

57

56

4.0/4.7

×

63×40

168

57

56

4.0/4.7

×

63×50

168

57

64

4.0/4.7

×

75×32

186

62

56

4.0/4.7

×

75×40

186

62

56

4.0/4.7

×

75×50

186

62

63

4.0/4.7

×

75×63

186

62

63

4.0/4.7

×

90×50

210

66

64

4.0/4.7

×

90×63

210

66

63

4.0/4.7

×

90×75

210

67

80

4.0/4.7

×

110×50

215

73

85

4.0/4.7

×

110×63

215

74

69

4.0/4.7

×

110×75

215

75

77

4.0/4.7

×

110×90

238

73

85

4.0/4.7

×

125×50

239

77

79

4.0/4.7

×

125×63

239

77

79

4.0/4.7

×

125×75

239

77

83

4.0/4.7

×

125×90

239

77

87

4.0/4.7

×

125×110

256

75

87

4.0/4.7

×

160×50

248

86

78

4.0/4.7

×

160×63

248

86

78

4.0/4.7

×

160×75

248

86

83

4.0/4.7

×

160×90

250

86

87

4.0/4.7

×

160×110

305

86

87

4.0/4.7

×

160×125

307

86

91

4.0/4.7

×

200×50

297

95

70

4.0/4.7

×

200×63

297

95

74

4.0/4.7

×

200×75

297

95

79

4.0/4.7

×

200×90

297

95

85

4.0/4.7

×

200×110

365

96

87

4.0/4.7

×

200×160

366

96

95

4.0/4.7

×

225×90

400

111

86

4.0/4.7

×

225×110

400

110

96

4.0/4.7

×

225×160

400

110

105

4.0/4.7

×

225×200

400

110

110

4.0/4.7

×

250×110

431

113

97

4.0/4.7

×

250×160

432

113

112

4.0/4.7

×

250×200

433

113

116

4.0/4.7

×

315×90

511

115

87

4.0/4.7

×

315×110

511

115

90

4.0/4.7

×

315×160

511

115

109

4.0/4.7

×

315×200

511

115

117

4.0/4.7

×

315×250

511

115

126

4.0/4.7

×

400×110

620

125

115

4.0/4.7

×

400×125

620

125

115

4.0/4.7

×

400×160

620

125

115

4.0/4.7

×

400×200

620

125

115

4.0/4.7

×

400×250

620

125

115

4.0/4.7

×

400×315

620

125

115

4.0/4.7

×

(Noted: the technical data is just for reference, some data may change, if you need exact data, then please contact us directly)


Our Product Range

As a integrated & experienced manufacturer & provider in China, SUNPLAST can supply HDPE electrofusion fittings in a diameter sizing from dn25mm to dn630mm. SUNPLAST HDPE electrofusion fittings include: HDPE electrofusion coupler, HDPE electrofusion reducer, HDPE electrofusion tee, HDPE electrofusion elbow 90 degree, HDPE electrofusion elbow 45 degree, HDPE electrofusion flange, HDPE electrofusion saddles.,etc


Here in SUNPLAST, all customers can find the best solution of fittings for their pipeline systems.

image005

Electrofusion procedure For HDPE Electrofusion Fittings

Electrofusion Fittings contain electrical filament wires which, when correctly connected to an

appropriate power source for the specified period of time, will fuse the coupling onto the pipe.


Tooling required for the welding of an electrofusion fitting is a suitable electrofusion control box with power supply and a scraper capable of removing 0.2-0.4mm from the

outside of the polyethylene pipe.


An alignment clamp should be used to ensure that the joint’s movement is kept to a minimum during the heating and cooling cycle together, with cleaning cloths and an indelible pen. A welding shelter should also be used to provide protection of the welding area against adverse weather conditions and

contamination.


The major procedure of butt welding including 4 steps:

1). Clean the pipe and cut ends squarely.

The pipe ends must be cut square and even by rotational pipe cutter, re-rounding the pipe edage if needed. Using cleaning cloths firstly clean the area of the pipe to be welded of any surface debris.

2). Mark Stab depth on the pipe

Without removing the sealed packaging mark on the pipe the area which is to be scraped, ie approximately 15-20mm beyond the insertion depth of the E/F coupler.

3). Scraping or peeling the outer surface of pipe edge.

Using a suitable pipe surface preparation tool“scraper” remove the pipe surface in the

selected area to a depth of 0.2-0.4mm; it is imperative at this stage of the operation that this is preformed correctly.

Wherever possible a mechanical end preparation tool is the preferred method of pipe surface preparation as it is capable of removing a continuous, even layer from the pipe surface.

4). Clean with suitable degreasing agent

Using degreasing agent to clean the scrap area, make sure no chippings or dirt on it

5). Stab E/F fittings completely into the HDPE pipe

Open the sealed bag containing the electrofusion fitting and slide it on to the pipe. The electrofusion coupler is fitted with a centre stop. Slide the fitting along the pipe until it comes into contact with the centre stop. Mark the insertion depth using an indelible marker pen.

6). Align & clamp the pipe

Correctly position and fit the restraining clamp to the assembly.

Clamps should always be used to secure an electrofusion assembly during the fusion cycle.

7). Fusion the joint

Input the fusion time either by using the information embossed on the coupler or by using the bar code affixed to the fitting. The method used will depend on the type of control box being used.

Once the coupler has completed the fusion cycle check that the melt indicators/melt wells show a successful fusion cycle has taken place. Melt wells, as shown above, should fill with melt to a point

approximately flush to the surface of the fitting. The melt indicators fitted to predominantly smaller fittings will rise beyond the body of the electrofusion fitting.

8). Cooling Time

Any handling, stresses or movement of the assembled pipe and/or fitting during the the cooling time may result in a reduced joint performance.

Only after completion of the cooling time mentioned on the fitting can the clamping tools and all other surrounding equipment may be dismantled.

image007


Manufacturing Facilities

SUNPLAST is a ISO9001 certificated manufacturing factory. As a premier manufacturer of HDPE electrofusion fittings, the factory owns mature technology, advanced production machine, professional workers & completed QC system. All electrofusion fittings are manufactured strictly in compliance with national standards and international standards.


Till now, there is over 30 sets of injection machines in SUNPLAST workshop, available to manufacture HDPE fittings till 800mm, and annual production capacity reaches 6,000 tons.

image009


FAQS

image011

*Whats electrofusion?

A: A resistive implant form of welding technique that is increasingly becoming popular is electrofusion welding. It is widely used to join together polyethylene pipes and pipe fittings, as well as pipes made of polypropylene material. By the word electrofusion, it can be understood that this welding technique uses electric current to form and strengthen pipeline joints.

In particular, metal coils are implanted on both ends of the pipes, and these coils are melted through resistive heating that comes from the current being passed through them. When the melted portion of the pipe fitting becomes solid, the two pipes are effectively and strongly joined.


* Can HDPE electrofusion coupler be used for welding the PPR pipe?

A: No, HDPE electrofusion coupler is manufactured & designed to weld to the HDPE pipeline only, NOT suitable for PPR pipe.


* Is scraping necessary before Electrofusion?

A: Yes, before electrofusion, the installer shall scrap the oxidation layer on both edage of HDPE pipe, the scrap area shall cover the edage of pipe to the marking line on the pipe, which mark insert depth of the electrofusion fittings. This is necessary step.


*How long will an electrofustion joint last?

A: If the pipe has been prepared in accordance with guidelines and the jointing process has been carried out correctly, by a competent installer, the HDPE electrofusion fitting is expected to last as long as the lifetime of the pipe system and a minimum of 50 years.


Contact Us

If you have any requirements on HDPE Electrofusion fittings, or any question on our fittings, please contact us freely. SUNPLAST has well trained staff who are available to address your needs and provide technical support to all sectors when needed.

image013

Our company adheres to the policy of 'comprehensive service, professional operation and efficient transportation' and the tenet of 'let customers save time and worry'. We are dedicated to providing every customer with comprehensive service and high-quality HDPE Tee Electrofusion Tee Ef Tee. Our company adheres to the people-oriented employment philosophy, and provides a broad space for career development under the principle of fairness, openness and justice. Our company has summed up a set of scientific production and management mode.

Hot Tags: HDPE electrofusion reducing tee, China, suppliers, manufacturers, factory, buy, price, made in China, electrofusion reducing coupling, uPVC Faucet Lateral Cross, pe reducer, hdpe tapping tee, Poly Ferrule Tee, uPVC Faucet Bend

Send Inquiry